Brücke (Crinan Bridge)
Swing bridge · Crinan Canal · United Kingdom
Show on mapPlan route from Crinan Basin
Brücke (Crinan Bridge) is a swing bridge (Crinan Canal, United Kingdom). Through the year: 1.5. to 2.10.: 08:30 to 17:00; 5.10. to 30.4.: Mon and Fri 08:30 to 17:00; no service otherwise. Today: none.
Harbour info
Swing bridge
Location: 56° 05,12' N 005° 32,90' W
Opening times
Through the year: 1.5. to 2.10.: 08:30 to 17:00; 5.10. to 30.4.: Mon and Fri 08:30 to 17:00; no service otherwise
| Day | Openings |
|---|---|
| Sun 25/10 | none |
| Mon 26/10 | 08:30 to 17:00 |
| Tue 27/10 | none |
| Wed 28/10 | none |
| Thu 29/10 | none |
| Fri 30/10 | 08:30 to 17:00 |
| Sat 31/10 | none |
All times in local time (Europe/London).
Times: Scottish Canals: Crinan Canal Skipper's Guide, Operating Season 2026, as of 2026-10-01
Notes
- Crinan Canal (Scottish Canals): Sommersaison 1.5. bis 2.10.2026 täglich 08:30 bis 17:00 Uhr; ab 5.10. nur auf Anfrage, vorab für einen Montag oder Freitag geplant, am Wochenende geschlossen (Telefon 01546 603210). Transit Licence mindestens einen Tag vorher kaufen; Tiefgang höchstens 2,0 m im Süßwasser; Schleusen und Brücken bedienen die Mitarbeiter, für die Schleusen 5 bis 13 braucht es Crew an Land.
Harbours nearby
- Crinan Basin 0.7 km NW
- Ardrishaig Basin 10.3 km SE
- Ardfern Yacht Centre 10.9 km N
- Craobh Marina 14.4 km N
Frequently asked questions
Brücke (Crinan Bridge): When does the bridge open?
Through the year: 1.5. to 2.10.: 08:30 to 17:00; 5.10. to 30.4.: Mon and Fri 08:30 to 17:00; no service otherwise. Today: none.
Sources: OpenStreetMap way/26614705, Scottish Canals: Crinan Canal Skipper's Guide, Operating Season 2026